Earth Work

service image

Marking

    • We use “TOTAL STATION” for all marking work.
    • A computerized marking machine with the highest accuracy that can store all data for future reference.
    • Marking for Excavation, Footing, and Column.

Excavation

    • Maximum Footing depth is excavated as per the soil condition & structural consultant's advice.
    • Soil Filling is done layer by layer on Avg 1 Feet ensuring proper soil compaction.
    • Anti-Termite treatment on all excavated surfaces.
service image
service image

LDPE Sheets (After Excavation)

    • LDPE (Low-Density Polyethylene) sheets are used before PCC to protect the soil surface.

Soil Filling & Compaction

    • Earth compactor ensures perfect soil compaction efficiently and quickly.
service image
service image

Anti-Termite Treatment

Advantages

    Advantages

    • From termites, rodents, and pests it provides immediate protection to any structure.
    • For several years it can last.
    • This treatment eliminates the problem of gaps forming in the protective barrier.
    • As compared to other forms of termite control liquid termiticides are relatively inexpensive.
    • The sides and the bottom surface of the foundation trenches and pits are treated with an anti-termite chemical at the rate of 5 Lit per square meter of surface area to a height of about 30cm for the excavation made for the foundation.
    • The earth’s surface is firstly cleaned from wooden and any other garbage particles for flooring and to the required elevation, the entire surface should be leveled.
    • At an interval of 15 cm holes of 30 cm depth are made and by adding water to the chemical an emulsion of correct concentration shall be made.
    • By pouring jars, this emulsion shall be poured in the holes and by using pressure pumps and sprayers, sprayed on the surface.
    • Through the holes, the chemical is allowed to get soaked fully.